Now that we have explored two regulatory frameworks for the derivation of interest rate risk (Wtp in The Netherlands and Solvency II on EU-level), let us investigate an alternative specification that uses historical data only. The current article focuses on the calculation of VaR scenarios for the interest rate using a method which we will call the BASE method.

The BASE method for VaR calculation entails exploration of the full available distribution of changes in the data series and making an inference regarding the likelihood of extreme observations over multiple projection horizons1. The structure resembles the percentile calculations in the Wtp model where the distribution of projections into the future is used to say something about the risk. The difference lies in the fact that the BASE method utilizes only observed (thus historical) data points. The relevance and reliability of the calculated risks is therefore influenced by the length and quality of the historical data. For the current analyses we have combined two datasets: long maturity Dutch sovereign bond rates (source: KEF, from 1900) as well as 12-year maturity zero-coupon bond rates (source: DNB, from 2004). Where the two datasets overlap, we assume that the DNB dataset is the most accurate. We have analyzed two periods: 1900-2023 (full period) and 1995-2023 (EU period).

How would our interest rate risks look if we have limited data points (EU period)?

First, we explore interest rate projections created using a restricted period starting from 1995, close to the initiation of the European Union. This period is characterized with declining interest rates mainly and a few short periods with interest rate increases.

Figure 1. The graph shows the development of the interest rate for the period 1995-2023. The data from 1995 – 2004 is based on the KEF dataset while the period 2005-2023 is based on DNB 12-year maturity zero-coupon rate.

Given that we observe relatively short periods of interest increases it is not surprising that when we use the BASE method to calculate the predicted VaR for the subsequent 10 years, it is characterised with an increase in the VaR99.5% in the first 2 years, flattening of the estimation at year 4 and a downward trajectory afterwards (See Figure 2). Actually one can conclude that even though the interest rate at VaR99.5% is expected to reach 6.1% level by year 2027, this increase in risk would decrease by 2033 where it is expected to be 3.8% (somewhat similar to current levels of 3.1%). The VaR50% and VaR0.5% are both downward sloping for most of the predicted periods. This is not surprising as the interest rate over that restricted period is also showing a downward trend.

Figure 2. The graph shows interest rate projections 10 years ahead using the BASE method (solid lines) in comparison to the Solvency II (2020) method (dashed lines). The period over which interest rate risk is calculated is 1995 – 2023. 99.5% level is used for the VaR scenario calculation.

When we compare the BASE predictions with Solvency II (2020) we note that the predictions up to 2 years ahead roughly align. However, as we go further in the future we see that the BASE predictions are much less conservative than the Solvency II model.

How reliable is the prediction based on the shorter period?

We use the validation method introduced in previous articles to back test the reliability of the BASE method. In this case we use 2005-2023 as the validation period over which we estimate performance metrics (correlation and validation). The graph below plots monthly data of 1-year ahead projections for VaR99.5%, 50% and 0.5% scenario relative to the actual observed rate in that period. For each datapoint in the validation timeframe, we use the real data from 1995 until the preceding year to derive the percentiles, thereby for 2008 percentiles calculation we have used 1995 – 2007 realized interest rate data.

Figure 3. The graph plots on monthly basis the 1-year ahead interest rate projections using the BASE method (red, blue, and green line corresponding to 99.5, 50 & 0.5 percentiles respectively) and realized DNB rate (black line) for the same period. The colored dashed lines are indicative projections as the BASE-method calculation is derived using a limited dataset (starting from 1995 and therefore 10 observations only for the 2005 period calculation) and therefore less reliable.

With a correlation of 85% between the VaR50% and the realized DNB rate, the BASE method is relatively good at capturing the expected trend. Since we are interested in capturing risk, we need to focus on the tails. The results are not as conclusive, only 91% of the observations fall below the estimated 99.5% VaR level therefore we are not able to capture 8.5% of the extreme observations. Furthermore, 4% of the observed data lies below the VaR0.5% level, indicating we are not capturing the lower tail accurately either. The overall volatility as measured by the distance between the upper and lower tails is also relatively low during the COVID and post-COVID period, which does not correspond well with the reality.

Can we improve accuracy by extending the historical dataset?

If we go further back in time and look at the development of the interest rate from 1900 onwards, we see that, except for the peaks around the two World Wars in 20s & 40s, the period until 1960 is relatively stable. What follows is a highly dynamic period characterized with prolonged periods of increased interest rate following steep but relatively shorter drops.

Figure 4. The graph shows the development of the interest rate for the period 1900-2023. The data from 1900 – 2004 is based on the KEF dataset while the period 2005-2023 is based on DNB 12-year maturity zero-coupon rate.

Calculation of the projected percentile levels using interest rate changes on the full dataset leads to more stable outcomes and resembles more the projections of the extended Solvency II (2020) model. As the distribution of the changes in interest rates over the full dataset is more normally distributed, we find that the projected VaR50% level fluctuates slightly around the current level of 3.1% over the full prediction period. Similar to the prediction based on the shorter period (see Figure 2), the VaR99.5% level does drop slightly after year 4, however, this is short-lived, and it increases to 7.4% by year 10. Contrary to the continuous decrease in VaR0.5% level, we observe an increase after year 6.

Figure 5. The graph shows interest rate projections 10 years ahead using the BASE method (solid lines) in comparison to the Solvency II (2020) method (dashed lines). The historical dataset used in the BASE method is a combination of KEF Bond rate data and DNB zero-coupon bonds rate. The period over which interest rate risk is calculated is 1995 – 2023. 99.5% level is used for the VaR scenario calculation.

Performing back testing of the BASE method on the full data series over the same validation period leads to better results. The correlation between the realized DNB rate and the VaR50% remains strong at 85%, and we see improvements at the tails prediction.

Figure 6. The graph plots on monthly basis the 1-year ahead interest rate projections using the BASE method (red, blue, and green line corresponding to 99.5, 50 & 0.5 percentiles respectively) and realized DNB rate (black line) for the same period.

The percentage of observations over the test period which lies below the 99.5% level is already 96%, while we do not see any realized data points which are under the 0.5% level. Furthermore, the volatility of estimated values tends to be larger, and the higher upper tail risk observed recently is captured a lot sooner (around the mid 2022 relative to beginning of 2023 in the shorter period validation, see Figure 3).  Overall, over the test period we are better able to capture the extremes by utilizing the longer 1900 data set rather than the shorter 1995 version.

How reliable are 10-year ahead projections?

When we perform the validation on a 10-year ahead interest rate projections, the model does not perform that well. The graph below (see Figure 7) indicates that as we try to predict the interest rate further into the future, we end up with less reliable estimates. The correlation between the VaR50% and the realized rate is low and negative (-48%), all observations fall below the 99.5% scenario (or even the 95%) which is indicative that we are overly conservative with respect to the upper tail risk when we predict 10 years into the future.

In addition, 20% of the observations lie below the 0.5% scenario which shows that the lower risk estimate was not low enough. This also tells us that the size of the declines in the 2015-2020 period was quite exceptional in comparison to all other periods of declines as observed in the full dataset. We note that the realised rates did not cross the lower percentile aggressively, but rather stay close to that lower band. This shows us that, although not very accurate, the model still provided a useful risk estimation.

Figure 7. The graph plots on monthly basis the 10-year ahead interest rate projections using the BASE method (red, blue, and green line corresponding to 99.5, 50 & 0.5 percentiles respectively) and realized DNB rate (black line) for the same period. 10-year ahead projection for 2018 is calculated using realized rates for the period 1900-2008.

This also serves as a reminder that estimates need to be updated frequently (at least on yearly basis) and that one should be more careful when utilising risks calculated for the more distant future (e.g. by using more conservative risk percentiles).

We have also performed validations on other horizons and noted that performance statistics remain high for projections up until 4 years into the future for the BASE model.

Do metrics above indicate that we should always use the full dataset when we calculate interest rate risk?

Figure 6 shows that the full dataset leads to better results compared to using only the short EU period. Indeed, having sufficient observations is very important for every statistical analysis, otherwise the validity of the results is compromised. Nevertheless, using the full dataset is not necessarily better if the current environment is different from most of the periods in the available dataset. For instance, if the available data includes mainly periods of relatively stable inflation, economic growth and employment our risk estimations would provide quite gentle risk estimations that would not be appropriate if the macro-economic environment changes to what we saw in 2022. Therefore, what matters more than using the full dataset is using the “correct data points”. That is, we might need to restrict our estimation to include only periods which resemble the current economic situation to get a proper risk estimation. It is evident note that the EU dataset (since 1995) failed to provide us with the context that is most similar to the current environment.

In a nutshell…

Utilizing regulatory frameworks such as Wtp and/or Solvency II is one way of approaching interest rate risk estimation. Alternatively, one can also analyze historical data and calculate the interest rate expected trajectory over different percentiles. Or as the saying goes, history repeats itself, so this approach seems reasonable.

In this article we have analyzed the performance of a relatively straightforward statistical technique for risk estimation (BASE method). We saw that the length of the historical data series is of paramount importance for an accurate risk estimation. When using a shorter dataset starting from 1995 to perform validation it is evident that the method does not capture the dynamics of the recent years fully. It fails to account for the variation at the tails and displays volatility levels that are too low in the post-COVID period. Recalculating the interest rate risk using the full dataset improves the results of the back testing. The validation results are now even better than the updated Solvency II model (2020 version).

However, one important point to note when using a model based on the full history is that it will also display similar high risk estimates during periods of relative stability. Many would find this too conservative and not necessary. Therefore we cannot consider those predictions ‘better’ if the current context is very different from many of the periods in the full history.

The BASE method has some limitations. One stems from the inability to adequately capture different maturities. The dataset before 2004 is constructed only for 10–15-year maturities. If we want to use the BASE method for the risk estimation of different maturities, we need to rely on DNB data only which dates to 2004 only and thus does not capture the full distribution well. Secondly, the BASE method does not say much about the context we are in.  If we do not have a proper understanding of the current dynamics affecting the interest rate, we cannot be certain that either the full (1900-) or the EU-era (1995-) period is better at estimating the future interest rate risk. We try to address this limitation by introducing the REGIME-based method of interest rate risk calculation which is discussed in subsequent articles.

footnotes

  1. This model can be seen as a simplified Vasicek model where no mean reversion correction is applied. This would make the model slightly more conservative in case this assumption does not hold, for example when interest rate levels were to deviate far from a unobserved long-term mean.
    This approach is consistent with findings by Jan Willem van den End who found a mean reversion parameter close to 0 for long-term interest rates in his research paper ‘Statistical evidence on the mean reversion of interest rates’ .
    ↩︎